Kicked off during June 2018, Facility of the Future is a collaborative study, led by Buoyant Production Technologies Ltd. on behalf of The Oil and Gas Technology Centre.

​The goal of the study is to mature an understanding of how a Floating NUI can be utilised in the UKCS to enable the development of marginal and stranded fields.

To date we have completed non field specific pre-FEED engineering on a Floating NUI production buoy, demonstrating the technical feasibility and lifecycle cost benefits of this development approach and maturing the technology ready for field-specific studies.

The study has been supported by Total E&P, Premier Oil, Siemens, BW Offshore, Wartsila, Lloyds Register, Ampelmann, Subsea7 & DNV GL.

Recent Posts

See All

BPT Commences Model Test on Floating Substation

September 2022 marked an exciting milestone for BPT and the development of their patented floating substation design, as they completed an initial round of model testing at the Wolfson Unit wave tank,

Comments


Commenting has been turned off.
bottom of page