Kicked off during June 2018, Facility of the Future is a collaborative study, led by Buoyant Production Technologies Ltd. on behalf of The Oil and Gas Technology Centre.
The goal of the study is to mature an understanding of how a Floating NUI can be utilised in the UKCS to enable the development of marginal and stranded fields.
To date we have completed non field specific pre-FEED engineering on a Floating NUI production buoy, demonstrating the technical feasibility and lifecycle cost benefits of this development approach and maturing the technology ready for field-specific studies.
The study has been supported by Total E&P, Premier Oil, Siemens, BW Offshore, Wartsila, Lloyds Register, Ampelmann, Subsea7 & DNV GL.